|
| MaxPower’s R&D and manufacturing laboratories are presently housed in an 8000 sq. ft. facility. A 600 sq. ft. dry room, a wet lab, associated processing and instrumentation areas, and two engineering bay areas constitute the general lay out of this facility. MaxPower has a second 4000 sq. ft. facility devoted to special R&D projects and houses a second 300 ft2 dry room.
|
|
| Some of our equipment includes the following: |
| • Versatile, modular coating system 6 inch wide continuous or skip coat. |
| • Calendering Machine |
| • Vacuum and high temperature ovens. |
| • Two glove boxes for electrolyte preparation |
| • State of the art winding machine for small production and customized runs of 18650 to double D-sized cells and “ultracapacitor” cells.
| | • 600 sq. ft. dry room operating year round with less than 1% relative humidity |
| • Crimper |
| • Micro-TIG Welder for Hermetic Glass to Metal (GTM) seals. |
| • Test laboratory containing seven Arbin Battery Testers: 200 plus channels |
| • Environmental chambers: -80°C to 100°C |
|